Trade · Yacht
Made-to-measure carpets for yacht and boat projects
Carpet on a yacht needs a millimetre-precise fit in narrow, curved spaces. Stair treads, cabin transitions and threshold details are measured on site, and cuts are made to fit the vessel.

By area of the vessel
Each part of the vessel has different needs; size, cut and finish are chosen to suit the area.
Cabin
Cabin floors are measured and cut to the shape of the vessel; in narrow, curved spaces, pieces are made to fit the vessel.
Related collection: Yacht carpetsSaloon
The saloon floor is measured on site; seams are planned around the furniture layout and the shape of the vessel.
Related collection: Yacht carpetsInterior stairs and passages
Steps and turning areas are fitted piece by piece. A bordered finish protects the curved edges.
Related collection: Stair carpetsCorridors and entrance halls
A dense, tightly woven surface for heavy use; threshold details are measured on site.
Related collection: Yacht carpetsWet areas and open deck
In areas exposed to damp, water and sun, the choice of material is assessed together, project by project. Our sales team will give you the suitable product and its document status for these areas in writing.
Renewals and refits
When the floor of an existing vessel is renewed, measurements are taken on site; production and installation are handled by one team.
How we work
On-site measurement
Steps, cabin transitions and threshold details are measured on the vessel.
Design and sample
Colour, texture and border proposals are approved on a sample.
Production to fit the vessel
Pieces are cut to the curved shape; edges are finished with a border.
On-site installation
The carpet is installed on the vessel; measurement, production and installation are handled by one team.
Documents
If the rules your vessel is subject to require a specific fire or maritime document, our sales team will give you the document status for each collection in writing.
Request a quote for your yacht project
Tell us where the vessel is, which sections are to be fitted and, if you have one, the measurement drawing; the measurement day is planned together.
